Technical consultancy and owner´s engineering for Ardley Energy-from-Waste Facility, United Kingdom
The UK waste management company Viridor retained Fichtner as technical advisor to draw up a proposal for a public-private partnership (PPP) contract for a residual waste treatment plant in Ardley. First of all we was contracted to prepare the permit application for the (EfW) facility as well as a due diligence report. After Viridor had won the PPP contract, Fichtner was awarded the follow-up contract for the realization phase as Owner´s Engineer.
Our services
- Technical due diligence
- Specification development
- Assessment of tenders
- Support for negotiations with shortlisted contractors
- Owners Engineer
- Full time site attendance
- CDM Advisory
Technical data
- Treatment capacity: 300,000 t/a
- Electrical rating: 28 MW
- Throughput: 2 x 23 t/h
- Heat release rate: 2 x 51.8 MW