Fichtner Through the Ages
Our History
Over 100 Years in the Service of Better Infrastructure
Since it was founded in 1922, Fichtner has been helping to shape the development of infrastructures and looks back today on a company history spanning more than a century. What began as an engineering firm has grown into a globally operating corporate group. Yet our goal has remained the same, namely sustainable improvement of infrastructures.
Take a journey through history with us and browse through the key milestones of our development.
2026

Fichtner Saudi Arabia
The existing branch in Saudi Arabia is converted into an independent subsidiary. In doing so, the Fichtner Group secures its market position, lays the groundwork for further market growth, and strengthens its role as a reliable and long-term partner for local clients.
2026

Sachsen Wasser Joins the Group
The Fichtner Group strengthens its expertise in international urban water management by integrating the Leipzig-based company ‘Sachsen Wasser GmbH’, which advises water supply and sanitation companies worldwide on operation & maintenance, organization, and finance.
2024

International Hydrogen Projects
Fichtner’s international expertise in hydrogen reaches a new level: After more than 30 years of experience in hydrogen project planning, the company enters a new dimension with the conceptual engineering of its first gigawatt-scale Power-to-X plant.
2023

Founding of Fichtner Baustellenservices
With this subsidiary, Fichtner strengthens its construction supervision and coordination capabilities in large-scale infrastructure projects, particularly in the areas of linear infrastructure such as overhead lines, cables, and offshore connections.
2023

Lange Joins the Fichtner Group
With the engineering and planning firm ‘Ingenieur- und Planungsbüro Lange GmbH & Co. KG’, the Fichtner Group strengthens its expertise in environmental and permit engineering for linear infrastructure projects and its fields of activity in environmental, spatial and urban planning.
2022

100 Years of Fichtner
A century of engineering expertise – Fichtner celebrates its 100th anniversary and stands today for independent consulting, technological expertise, and international collaboration.
2021

Founding of Fichtner Australia
In view of rising demand in the renewable energy, hydrogen, and thermal waste treatment sectors, a further subsidiary of the Fichtner Group is founded in Sydney.
2020

Fichtner Digital Grid
Germany
Fichtner develops a portal for connection management in the distribution grid, enabling requests for grid connection of distributed generation plants to be checked against available capacities and processed automatically. The immediate response accelerates the connection procedures, reduces the burden on the grid operator and thus promotes the necessary expansion of renewable infeeders over a widespread area.
2018

Noor-Quarzazate
Morocco
In the south of Morocco, commissioning of the second and third plant sections results in Africa’s largest solar power plant complex to date. As independent engineer, Fichtner supports the implementation of the three solar thermal power plants Noor 1-3.
2017

C/sells: energy system of the future
Germany
As the largest showcase of the SINTEG research and demonstration project, C/sells provides scalable model solutions for a sustainable energy supply and shows what the energy transition will look like: cellular, participatory and versatile. In this pioneering initiative, Fichtner handled project control and coordination for the 57 partners from science, industry, and grid operation.
2013

Malawi power sector
As part of Malawi’s largest energy project to date, Fichtner is contracted as owner's engineer for implementation of transmission lines and substations throughout the country, as well as rehabilitation of a hydropower plant.
2011

Photovoltaic project development
South Africa
Since the 2010s, many PV plants are increasingly being developed, financed, built and operated by project developers as “Independent Power Producers (IPP)” outside of Europe as well. Fichtner supports the world’s largest IPP photovoltaic projects as technical advisor.
2010

Grid connection of offshore wind farms
Germany
Since 2010, Fichtner has been supporting transmission system operators in the conceptual design, planning and construction of HVDC lines and grid connection projects of offshore wind farms in the North Sea, thus contributing to the success of energy transition projects in Germany.
(Photo: TenneT)
2010

Founding of Fichtner Vietnam
Fichtner’s order portfolio includes power supply projects in Vietnam, allowing the founding of a subsidiary in Hanoi. The local presence with another Group company intensifies our coverage of the Southeast Asian market.
2008

Carbon capture & storage (CCS)
Norway
Fichtner plans a retrofit of the 420-MW CCGT power plant at the Norwegian gas terminal Kårstø with a CO2 capture and compression plant. This demonstration project is the first time CCS technology is executed on a large scale.
2005

Kabul
Afghanistan
For many years, Fichtner works for development banks on the reconstruction of infrastructure destroyed during the war. In various parts of the country, we assist in the restoration and expansion of the electricity and water supply.
2002

Founding of Fichtner Italia
The Genoa-based subsidiary ‘Fichtner Italia’ supports the Fichtner Group with services for energy and waste management and strengthens the company’s presence in Southern Europe.
2001

Hybrid desalination plant
United Arab Emirates
With the Fujairah I CCGT power plant, Fichtner plans the world’s first large-scale hybrid desalination plant. The energy efficiency of the entire desalination process is optimized by combining thermal desalination with reverse osmosis technology.
1999

Founding of Fichtner Bauconsulting
Fichtner’s civil engineering services are expanded and independently marketed. The subsidiary ‘Fichtner Bauconsulting’ is founded for this purpose.
1998

500 kV power transmission
People’s Republic of China
For expansion of the 500-kV high-voltage transmission grid, Fichtner assists with design, tendering, contract award, and construction of an approx. 1000 km-long high-voltage double-circuit line. The river crossing over the Yangtze with a span of 2.3 km sets new standards worldwide.
1997

Windhoek
Namibia
Entry for Fichtner into water management projects of international development cooperation. For the City of Windhoek, Fichtner plans the first plant for an integrated drinking water and wastewater treatment system.
1996

Geothermal district heating project
Denizli, Türkiye
Fichtner leads an international consortium analyzing both the heating market and the geothermal utilization potential of the region.
1992

Recuperación de Energía
Barcelona
Fichtner acquires a stake in RESA in Spain, thus entering the Spanish-speaking market for waste treatment plants. Later, RESA becomes a wholly owned subsidiary and is incorporated into the Fichtner Group.
1992

Extension building at head office
Due to the steady growth of the Fichtner Group, an extension is added to the company building in Stuttgart. It enables the Group members located at the site, with a total of around 700 employees, to work closely together.
1992

Fichtner IT Consulting
To meet the challenges of rapidly developing information technology, Fichtner founds CAD Informationssysteme GmbH in 1992. Over the years, it has evolved into today’s Fichtner IT Consulting.
1992

Water supply & sanitation
After German reunification, Fichtner founds ‘Wassertechnik Leipzig’ with experienced water supply and wastewater treatment specialists from the new federal states of Germany. It is integrated into Fichtner Water & Transportation, which was founded later and is now active in water and waste management, environmental planning and geotechnical engineering, hydraulic engineering, transportation, and mining.
1991

Fichtner Management Consulting
The techno-economic focus of our consulting services is expanded from the nineties onwards. Management consultants strengthen the consulting teams, and economic consulting for the energy industry is added. The development of this line of business lays the foundation for Fichtner Management Consulting, which is founded later.
1991

Founding of Fichtner Consulting Engineers
Founded in 1991, Stockport-based Fichtner Consulting Engineers is now one of the UK’s leading specialists in thermal waste treatment, renewable energies, and power transmission.
1990

Wind energy incentive program
Germany
Fichtner advises the German government on the development of an incentive program for wind energy and draws up criteria for the design of the legal framework.
1989

Founding of Fichtner Pacific
Fichtner Pacific Engineers, founded in Taiwan, strengthens Fichtner’s presence in the East Asian region.
1987

Founding of Fichtner India
With the founding of our Indian subsidiary, the internationalization of the Fichtner Group gains momentum.
1987

Hydrogen technology
Fichtner assists in the development of a research and test facility for generating solar hydrogen with photovoltaic water electrolysis. For Fichtner, this is the cornerstone for building up expertise in dealing with hydrogen. We continue to work for the German Aerospace Center (DLR) to this day, primarily performing complex planning tasks for the cryogenic media supply of rocket propulsion systems and testbeds.
(Photo: ESA)
1985

Wind energy converter in Wilhelmshaven
Germany
Since the 1980s, Fichtner has been actively involved as owner’s engineer in the success story of wind energy.
1982

New head office in Stuttgart
Major projects change the way we work at Fichtner. In 1982, we move into our own office building where large project teams can organize their interdisciplinary collaboration perfectly and deal with complex issues quickly.
1980

Network control center in Yanbu
Saudi Arabia
Fichtner develops the first network control center with real-time data acquisition for the Yanbu power plant and desalination complex.
1977

Almería Solar Plant
Fichtner gets involved in the development of solar thermal power plants and assists in the development of solar energy throughout all stages: research & development, optimization, market launch, and commercial application. The first large-scale plant is built on a test site in the Spanish province of Almería.
(Photo: DLR)
1975

Al Khobar
Saudi Arabia
Our entry into the technology of thermal seawater desalination with the Al Khobar II desalination plant marks the start of Fichtner’s involvement in the Arab Gulf states.
1972

Java
Indonesia
Fichtner wins a contract for the electrification of a large part of the island of Central Java. This is followed by power transmission projects in the Middle East, Africa and Latin America for the Electrical Networks division.
1969

Elbistan
Türkiye
As leader of an international consortium, Fichtner is awarded a contract for design review and construction supervision of the 4x344-MW Elbistan lignite-fired power plant, at that time Türkiye’s largest power plant project.
1966

Ashuganj
East Pakistan
The 2x64-MW oil-fired steam power plant financed by German development aid is the first major overseas project for Fichtner. In 1971, the Fichtner team was evacuated on account of the war of independence, but our engineers were able to return following the establishment of the state of Bangladesh and successfully complete the contract in 1977.
1961

Municipal utility in Stuttgart
Fichtner wins a substantial order in the field of environmental technology right on its own doorstep in Stuttgart-Münster, encompassing detailed engineering and site management for a waste-to-energy plant – at that time one of the largest of its kind in the Federal Republic of Germany.
1954

Deutsche Linoleum Werke
Bietigheim
By planning the first of four industrial power plants for linoleum manufacturer ‘Deutsche Linoleum Werke’, Fichtner develops into a consulting and engineering firm for plant design and construction supervision.
1948

Fichtner in Stuttgart
Martin Fichtner and his sons Wolfgang and Kurt succeed in resuming business operations in southern Germany in 1948. The “Engineering Company Fichtner Consulting Engineers for Energy and Heat Management” receives its first energy-related orders in the Stuttgart area.
1930

World Power Conference in Berlin
The World Power Conference, forerunner of today’s World Energy Congress, addresses issues related to energy distribution and utilization. Martin Fichtner focuses on techno-economic contexts in his technical presentation on heating technology.
1924

Teplice-Schönau
Czechoslovakia
Initially, the small engineering firm, specializing in design calculations and acceptance measurements for steam boilers, is housed in the same building that the family lives in.
1922

Martin Eugen Fichtner
(1888-1957)
Martin Fichtner founds the “Technical Office for Energy and Heat Management”, thus laying the foundation for today’s Fichtner Group.